Cabinetry, stone and light — one composition.
Most kitchens are assembled from three separate decisions made months apart by three different people. We make them together, at the start, and the room is coherent because of it.
Key facts
Miami kitchen commissions, at a glance
- Investment band
- $150,000 – $450,000
- Total timeline
- 6 – 9 months
- Design & curation
- 8 – 12 weeks, including the walkthrough film
- Imported cabinetry
- 14 – 20 weeks from Italy
- Installation
- 8 – 12 weeks
- Condo / HOA approval
- 4 – 6 weeks, run in parallel with design
- Commissions per year
- 12, each led by a principal

01 · Cabinetry
Imported when it should be. Built here when that's better.
We work with two Italian houses and one local shop in Hialeah. Which one makes your kitchen depends entirely on the room — a seamless twenty-foot run of lacquer comes from Italy; a piece that has to negotiate a 1920s Coral Gables wall gets built forty minutes away.
Everything is specified for this climate: marine-grade substrates, stainless carcass hardware, and finishes tested against the humidity that destroys ordinary cabinetry within five years.
- Italian production
- 14 – 20 weeks including freight and customs
- Local production
- 8 – 11 weeks
- Finishes
- Lacquer, veneer, fenix, blackened oak, brushed metal
- Hardware
- Stainless, marine-rated, concealed throughout
02 · Stone & surfaces
What stone works best in a Miami kitchen?
Quartzite and porcelain both handle Miami humidity and hard daylight without fading or etching. Marble is beautiful and it will patina — we use it where that is genuinely wanted, and we say so plainly beforehand. Dark granites read flat under Florida light, which is why we rarely specify them.
Full slabs come to your driveway, or we fly to Carrara on commissions above $250,000. Either way the veining is composed on paper — where the book-match falls on the island, where the seam hides — before anyone touches a saw.
- Quartzite
- $140 – $240 /sq ft installed · hardest natural option
- Porcelain
- $110 – $190 /sq ft · largest uninterrupted runs
- Marble
- $130 – $320 /sq ft · patinas by design
- Quarry visit
- Included above $250,000




03 · Design & lighting
Light is the material nobody budgets for.
A kitchen with one lighting circuit can only ever be one room. We programme four scenes — Morning, Work, Dinner, Late — and hand them to you on your phone at the reveal.
Before any of it is built you receive a rendered walkthrough film: the room, its lighting states, the actual stone, the real sightlines. Most clients watch it a dozen times. Nobody has ever approved a kitchen from a floor plan and been as certain.
- —Architectural plans, elevations and reflected ceiling
- —A rendered walkthrough film before approval
- —Four programmed lighting scenes, handed over on your phone
- —Structural, MEP and HOA coordination handled by the studio

Scope
What does a luxury kitchen remodel include?
One contract, one principal, one crew. Including the parts that usually become your problem.
01
Design & film
Architectural drawings, lighting design, material curation and a rendered walkthrough before a cent is committed.
02
Permits & boards
Miami-Dade permitting, condo applications, COIs for every trade, elevator scheduling, noise-window compliance.
03
Structure & services
Demolition, framing, beams, electrical, plumbing, gas, ventilation and any hurricane-rated glazing changes.
04
Cabinetry
Italian or local production, delivered and installed by one crew with all interior fittings and integration.
05
Stone
Slab selection, veining composition, templating, fabrication, installation and full-height elevations.
06
Reveal
Lighting scenes programmed, room styled and photographed, punch list closed within ten days.
Questions
About the work itself.
Four things clients ask once the price stops being the question.
What does a luxury kitchen remodel include?
Architectural and lighting design, a rendered walkthrough film, permits and HOA coordination, demolition, structural work, electrical and plumbing, bespoke or imported cabinetry, full-slab stone, integrated appliances, programmed lighting scenes, styling and photography. One contract, one principal.
Why does Italian cabinetry take so long?
It is built to order, not pulled from stock: fourteen to twenty weeks covers production, finishing, sea freight and customs. We start milling against approved drawings rather than waiting for site readiness, which recovers roughly six weeks.
What stone works best in a Miami kitchen?
Quartzite and porcelain handle humidity and hard daylight without fading or etching. Marble patinas — beautiful where that is wanted, and we say so beforehand. Dark granites read flat under Florida light.
How do you handle condo boards and HOA approval?
We prepare and file the building application, supply certificates of insurance for every trade, schedule service elevators and work inside each building's noise windows. In Miami-Dade this typically takes four to six weeks, run alongside design rather than after it.
Next step
Two hours, at dusk, at your house.
You leave with a written investment band and a short film of the kitchen you don't have yet.